Documentation- Wells MOnitoring » History » Version 1
Pavneet Kaur, 29/03/2019 15:13
1 | 1 | Pavneet Kaur | h1. Documentation- Wells Monitoring, Manual |
---|---|---|---|
2 | 1 | Pavneet Kaur | |
3 | 1 | Pavneet Kaur | *Timings*: The person assigned the job of monitoring collects the readings in three slots. |
4 | 1 | Pavneet Kaur | |
5 | 1 | Pavneet Kaur | 1. Between 6 am to 7 am till about 9 am to 10 am. |
6 | 1 | Pavneet Kaur | 2. Between 11 am and 1 pm |
7 | 1 | Pavneet Kaur | 3. Between 2 pm and 5 pm |
8 | 1 | Pavneet Kaur | |
9 | 1 | Pavneet Kaur | *Things required*: |
10 | 1 | Pavneet Kaur | • Notebook |
11 | 1 | Pavneet Kaur | • Pen |
12 | 1 | Pavneet Kaur | • Measuring tape |
13 | 1 | Pavneet Kaur | • Vehicle for movement |
14 | 1 | Pavneet Kaur | |
15 | 1 | Pavneet Kaur | |
16 | 1 | Pavneet Kaur | *Ethics*- |
17 | 1 | Pavneet Kaur | • The monitoring should happen in coordination with the community members/ care taker (assigned by the person in charge from within the community). There should be a clear communication from monitor side as to which days the monitoring of a well has to happen and at around what time so that it can be made sure that the pump is not turned on before monitoring. In case a pump was turned on in a well, the monitor should have a gap of about 5 hours on the same day before going again for monitoring. |
18 | 1 | Pavneet Kaur | • The monitor should have contact numbers of the person in charge/ care taker for any communication. |
19 | 1 | Pavneet Kaur | • If the monitoring is stopped for any reason at any point, the monitor should communicate the same to the person concerned. |
20 | 1 | Pavneet Kaur | • The monitor shall take responsibility to inform any kind of changes in a well in terms of its functioning etc. |
21 | 1 | Pavneet Kaur | • The monitor should report to the CSR Geomatics Team who has responsibility to publish data. |
22 | 1 | Pavneet Kaur | • The monitor published the data to the website and works with the geomatics team. |
23 | 1 | Pavneet Kaur | |
24 | 1 | Pavneet Kaur | |
25 | 1 | Pavneet Kaur | *Definitions:* |
26 | 1 | Pavneet Kaur | A master file is maintained with the records of the wells from the field. It is updated when a new well is located. The following set of information are filled out in the Masterfile. |
27 | 1 | Pavneet Kaur | |
28 | 1 | Pavneet Kaur | *Well type* |
29 | 1 | Pavneet Kaur | 1. Open |
30 | 1 | Pavneet Kaur | 2. Borewell |
31 | 1 | Pavneet Kaur | 3. Dug cum borewell |
32 | 1 | Pavneet Kaur | |
33 | 1 | Pavneet Kaur | *Well status* |
34 | 1 | Pavneet Kaur | 1. In use |
35 | 1 | Pavneet Kaur | 2. Not in use |
36 | 1 | Pavneet Kaur | 3. Closed |
37 | 1 | Pavneet Kaur | |
38 | 1 | Pavneet Kaur | *Pump Status* |
39 | 1 | Pavneet Kaur | 1. Functioning |
40 | 1 | Pavneet Kaur | 2. Not functioning |
41 | 1 | Pavneet Kaur | |
42 | 1 | Pavneet Kaur | *Pump Automation* |
43 | 1 | Pavneet Kaur | 1. Manual |
44 | 1 | Pavneet Kaur | 2. Automatic |
45 | 1 | Pavneet Kaur | |
46 | 1 | Pavneet Kaur | *Non-accessibility factors* |
47 | 1 | Pavneet Kaur | 1. Dogs |
48 | 1 | Pavneet Kaur | 2. Heavy slab |
49 | 1 | Pavneet Kaur | 3. Narrow casing |
50 | 1 | Pavneet Kaur | 4. enclosed/locked |
51 | 1 | Pavneet Kaur | 5. permission |
52 | 1 | Pavneet Kaur | |
53 | 1 | Pavneet Kaur | *Data Matching Accuracy (reconnecting with harvest wells data)* |
54 | 1 | Pavneet Kaur | 1. High |
55 | 1 | Pavneet Kaur | 2. Medium |
56 | 1 | Pavneet Kaur | 3. Low |
57 | 1 | Pavneet Kaur | |
58 | 1 | Pavneet Kaur | *Well coordinates* |
59 | 1 | Pavneet Kaur | For a new well, coordinates of the well position are taken on a mobile GPS. |
60 | 1 | Pavneet Kaur | Person In charge |
61 | 1 | Pavneet Kaur | For communication purpose, contact the person in charge as recorded in directory. |