Documentation- Wells MOnitoring » History » Version 1
Pavneet Kaur, 29/03/2019 15:13
| 1 | 1 | Pavneet Kaur | h1. Documentation- Wells Monitoring, Manual |
|---|---|---|---|
| 2 | 1 | Pavneet Kaur | |
| 3 | 1 | Pavneet Kaur | *Timings*: The person assigned the job of monitoring collects the readings in three slots. |
| 4 | 1 | Pavneet Kaur | |
| 5 | 1 | Pavneet Kaur | 1. Between 6 am to 7 am till about 9 am to 10 am. |
| 6 | 1 | Pavneet Kaur | 2. Between 11 am and 1 pm |
| 7 | 1 | Pavneet Kaur | 3. Between 2 pm and 5 pm |
| 8 | 1 | Pavneet Kaur | |
| 9 | 1 | Pavneet Kaur | *Things required*: |
| 10 | 1 | Pavneet Kaur | • Notebook |
| 11 | 1 | Pavneet Kaur | • Pen |
| 12 | 1 | Pavneet Kaur | • Measuring tape |
| 13 | 1 | Pavneet Kaur | • Vehicle for movement |
| 14 | 1 | Pavneet Kaur | |
| 15 | 1 | Pavneet Kaur | |
| 16 | 1 | Pavneet Kaur | *Ethics*- |
| 17 | 1 | Pavneet Kaur | • The monitoring should happen in coordination with the community members/ care taker (assigned by the person in charge from within the community). There should be a clear communication from monitor side as to which days the monitoring of a well has to happen and at around what time so that it can be made sure that the pump is not turned on before monitoring. In case a pump was turned on in a well, the monitor should have a gap of about 5 hours on the same day before going again for monitoring. |
| 18 | 1 | Pavneet Kaur | • The monitor should have contact numbers of the person in charge/ care taker for any communication. |
| 19 | 1 | Pavneet Kaur | • If the monitoring is stopped for any reason at any point, the monitor should communicate the same to the person concerned. |
| 20 | 1 | Pavneet Kaur | • The monitor shall take responsibility to inform any kind of changes in a well in terms of its functioning etc. |
| 21 | 1 | Pavneet Kaur | • The monitor should report to the CSR Geomatics Team who has responsibility to publish data. |
| 22 | 1 | Pavneet Kaur | • The monitor published the data to the website and works with the geomatics team. |
| 23 | 1 | Pavneet Kaur | |
| 24 | 1 | Pavneet Kaur | |
| 25 | 1 | Pavneet Kaur | *Definitions:* |
| 26 | 1 | Pavneet Kaur | A master file is maintained with the records of the wells from the field. It is updated when a new well is located. The following set of information are filled out in the Masterfile. |
| 27 | 1 | Pavneet Kaur | |
| 28 | 1 | Pavneet Kaur | *Well type* |
| 29 | 1 | Pavneet Kaur | 1. Open |
| 30 | 1 | Pavneet Kaur | 2. Borewell |
| 31 | 1 | Pavneet Kaur | 3. Dug cum borewell |
| 32 | 1 | Pavneet Kaur | |
| 33 | 1 | Pavneet Kaur | *Well status* |
| 34 | 1 | Pavneet Kaur | 1. In use |
| 35 | 1 | Pavneet Kaur | 2. Not in use |
| 36 | 1 | Pavneet Kaur | 3. Closed |
| 37 | 1 | Pavneet Kaur | |
| 38 | 1 | Pavneet Kaur | *Pump Status* |
| 39 | 1 | Pavneet Kaur | 1. Functioning |
| 40 | 1 | Pavneet Kaur | 2. Not functioning |
| 41 | 1 | Pavneet Kaur | |
| 42 | 1 | Pavneet Kaur | *Pump Automation* |
| 43 | 1 | Pavneet Kaur | 1. Manual |
| 44 | 1 | Pavneet Kaur | 2. Automatic |
| 45 | 1 | Pavneet Kaur | |
| 46 | 1 | Pavneet Kaur | *Non-accessibility factors* |
| 47 | 1 | Pavneet Kaur | 1. Dogs |
| 48 | 1 | Pavneet Kaur | 2. Heavy slab |
| 49 | 1 | Pavneet Kaur | 3. Narrow casing |
| 50 | 1 | Pavneet Kaur | 4. enclosed/locked |
| 51 | 1 | Pavneet Kaur | 5. permission |
| 52 | 1 | Pavneet Kaur | |
| 53 | 1 | Pavneet Kaur | *Data Matching Accuracy (reconnecting with harvest wells data)* |
| 54 | 1 | Pavneet Kaur | 1. High |
| 55 | 1 | Pavneet Kaur | 2. Medium |
| 56 | 1 | Pavneet Kaur | 3. Low |
| 57 | 1 | Pavneet Kaur | |
| 58 | 1 | Pavneet Kaur | *Well coordinates* |
| 59 | 1 | Pavneet Kaur | For a new well, coordinates of the well position are taken on a mobile GPS. |
| 60 | 1 | Pavneet Kaur | Person In charge |
| 61 | 1 | Pavneet Kaur | For communication purpose, contact the person in charge as recorded in directory. |