Project

General

Profile

26/12/2018

Added by Philippe May almost 6 years ago

Chair
Dorian

Notekeeper
Philippe

Announcements

Merry Xmas

Round table

Ram

Survey, line work, shapefiles

Raj

Survey: Waste water treatment area, residential zone in progress

+/- follow flow of the surface water

Pavneet

Work of international zone.

Organization of the scheme of file structure (naming convention)

Bala

Monitoring

Piezometer: calibration quite fine (2 pieces)

Arrange purchase of "The Boxes" (casing for equipment)

  • Discussion about rain fall this year and averages **

Philippe

Implementation of tags

Meera

Welcome back :)

Giulio

Struggling with budget

Flow meter

Rain water harvesting

Drone: Om (Sunlit Future) has one

Dorian

Work on waste water treatment plants: study domain, measurement protocols (weighted average of use categories, density, etc).