Wells Monitoring (Manual and Automatic Piezometer » History » Version 1
Giulio Di Anastasio, 06/05/2021 11:50
1 | 1 | Giulio Di Anastasio | h1. Wells Monitoring (Manual and Automatic Piezometer |
---|---|---|---|
2 | 1 | Giulio Di Anastasio | |
3 | 1 | Giulio Di Anastasio | h2. Manual- Using tape with a sensor |
4 | 1 | Giulio Di Anastasio | |
5 | 1 | Giulio Di Anastasio | Timings: The person assigned the job of monitoring collects the readings in three slots. |
6 | 1 | Giulio Di Anastasio | |
7 | 1 | Giulio Di Anastasio | 1. Between 6 am to 7 am till about 9 am to 10 am. |
8 | 1 | Giulio Di Anastasio | 2. Between 11 am and 1 pm |
9 | 1 | Giulio Di Anastasio | 3. Between 2 pm and 5 pm |
10 | 1 | Giulio Di Anastasio | |
11 | 1 | Giulio Di Anastasio | Things required: |
12 | 1 | Giulio Di Anastasio | • Notebook |
13 | 1 | Giulio Di Anastasio | • Pen |
14 | 1 | Giulio Di Anastasio | • Measuring tape |
15 | 1 | Giulio Di Anastasio | • Vehicle for movement |
16 | 1 | Giulio Di Anastasio | |
17 | 1 | Giulio Di Anastasio | |
18 | 1 | Giulio Di Anastasio | *Ethics*- |
19 | 1 | Giulio Di Anastasio | • The monitoring should happen in coordination with the community members/ care taker (assigned by the person in charge from within the community). There should be a clear communication from monitor side as to which days the monitoring of a well has to happen and at around what time so that it can be made sure that the pump is not turned on before monitoring. In case a pump was turned on in a well, the monitor should have a gap of about 5 hours on the same day before going again for monitoring. |
20 | 1 | Giulio Di Anastasio | • The monitor should have contact numbers of the person in charge/ care taker for any communication. |
21 | 1 | Giulio Di Anastasio | • If the monitoring is stopped for any reason at any point, the monitor should communicate the same to the person concerned. |
22 | 1 | Giulio Di Anastasio | • The monitor shall take responsibility to inform any kind of changes in a well in terms of its functioning etc. |
23 | 1 | Giulio Di Anastasio | • The monitor should report to the CSR Geomatics Team who has responsibility to publish data. |
24 | 1 | Giulio Di Anastasio | • The monitor published the data to the website and works with the geomatics team. |
25 | 1 | Giulio Di Anastasio | |
26 | 1 | Giulio Di Anastasio | |
27 | 1 | Giulio Di Anastasio | *Definitions*: |
28 | 1 | Giulio Di Anastasio | A master file is maintained with the records of the wells from the field. It is updated when a new well is located. The following set of information are filled out in the Masterfile. |
29 | 1 | Giulio Di Anastasio | |
30 | 1 | Giulio Di Anastasio | *Well type* |
31 | 1 | Giulio Di Anastasio | 1. Open |
32 | 1 | Giulio Di Anastasio | 2. Borewell |
33 | 1 | Giulio Di Anastasio | 3. Dug cum borewell |
34 | 1 | Giulio Di Anastasio | |
35 | 1 | Giulio Di Anastasio | *Well status* |
36 | 1 | Giulio Di Anastasio | 1. In use |
37 | 1 | Giulio Di Anastasio | 2. Not in use |
38 | 1 | Giulio Di Anastasio | 3. Closed |
39 | 1 | Giulio Di Anastasio | |
40 | 1 | Giulio Di Anastasio | *Pump Status* |
41 | 1 | Giulio Di Anastasio | 1. Functioning |
42 | 1 | Giulio Di Anastasio | 2. Not functioning |
43 | 1 | Giulio Di Anastasio | |
44 | 1 | Giulio Di Anastasio | *Pump Automation* |
45 | 1 | Giulio Di Anastasio | 1. Manual |
46 | 1 | Giulio Di Anastasio | 2. Automatic |
47 | 1 | Giulio Di Anastasio | |
48 | 1 | Giulio Di Anastasio | * Non-accessibility factors* |
49 | 1 | Giulio Di Anastasio | 1. Dogs |
50 | 1 | Giulio Di Anastasio | 2. Heavy slab |
51 | 1 | Giulio Di Anastasio | 3. Narrow casing |
52 | 1 | Giulio Di Anastasio | 4. enclosed/locked |
53 | 1 | Giulio Di Anastasio | 5. permission |
54 | 1 | Giulio Di Anastasio | |
55 | 1 | Giulio Di Anastasio | *Data Matching Accuracy (reconnecting with harvest wells data)* |
56 | 1 | Giulio Di Anastasio | 1. High |
57 | 1 | Giulio Di Anastasio | 2. Medium |
58 | 1 | Giulio Di Anastasio | 3. Low |
59 | 1 | Giulio Di Anastasio | |
60 | 1 | Giulio Di Anastasio | *Well coordinates* |
61 | 1 | Giulio Di Anastasio | For a new well, coordinates of the well position are taken on a mobile GPS. |
62 | 1 | Giulio Di Anastasio | Person In charge |
63 | 1 | Giulio Di Anastasio | For communication purpose, contact the person in charge as recorded in directory. |
64 | 1 | Giulio Di Anastasio | |
65 | 1 | Giulio Di Anastasio | h2. Automatic- Piezometer (by bala, to be edited) |
66 | 1 | Giulio Di Anastasio | |
67 | 1 | Giulio Di Anastasio | The calibrations and setting are already done by Azha |
68 | 1 | Giulio Di Anastasio | The piezometer is taken to the site of unused well. First the depth and Water level is checked manually using water meter |
69 | 1 | Giulio Di Anastasio | Then the sensor of the piezometer is inserted into the well 1m above the bottom of the well, so the sensor does not get affected from mud or water inside |
70 | 1 | Giulio Di Anastasio | The sensor sends the data to an electronic board which translates the signal into the proper output, and then it sends the signal to the transmitting device above, on the ground surface. The transmitter then sends it to the receiver at CSR, the signal is then routed to Talam office through Interneet, enters the software and the reading is processed. |
71 | 1 | Giulio Di Anastasio | The piezometer sometimes does not have proper signal and so it would not be able to send it |